AltaLink Substation Reclamation

AltaLink Substation Reclamation

AltaLink Substation Reclamation NORTHERN ALBERTA PROJECT SUMMARY AltaLink needed to reclaim their decommissioned Judy Creek Substation located in northern Alberta and apply for a reclamation certificate. A typical substation reclamation project involves determining...
Gas-Fired Power Plant Approval

Gas-Fired Power Plant Approval

Gas-Fired Power Plant Approval ALBERTA PROJECT SUMMARY Signalta Resources required approvals from both Alberta Environment and Parks (AEP) and the Alberta Utilities Commission in order to construct a new natural gas-fired power co-generation facility providing...
Elemental Energy Brooks Solar Project

Elemental Energy Brooks Solar Project

Elemental Energy Brooks Solar Project ALBERTA PROJECT SUMMARY Elemental Energy developed a 15 MWac solar facility in Brooks, Alberta – the first utility-scale solar project in western Canada. During a pre-construction site visit, Elemental Energy personnel noticed...
City of Calgary 12 St. S.E. Bridge Replacement

City of Calgary 12 St. S.E. Bridge Replacement

City of Calgary 12 St. S.E. Bridge Replacement CALGARY, ALBERTA PROJECT SUMMARY The City of Calgary recently embarked on a project to replace the 109-year-old 12 Street S.E. Bridge over the Bow River, the main access point between the Calgary Zoo and locations to the...