Canadian infrastructure and development projects require excess soil to be managed safely and in ways that promote beneficial reuse of valuable resources, reduce clean soil being sent to landfills, and mitigate environmental impacts.
Jack Tennant Memorial Bridge Fish Habitat Offsetting
The Jack Tennant Memorial Bridge Fish Habitat Offsetting Project was required by Fisheries and Oceans Canada to offset the impact on fish and fish habitat resulting from the temporary instream bridge berm installed for the Jack Tennant Memorial Bridge Project.
12 Street Southeast Bridge Replacement Hydrotechnical Engineering and Environmental Services
The original 12 Street Southeast Bridge was constructed in 1908 to carry horse and buggy, as well as pedestrians, to St. George’s Island. Over the next 100+ years, the bridge became an important connector link for vehicles and pedestrians.
Fish Habitat Offsetting for 12 Street Southeast Bridge Replacement
The City of Calgary required a Fisheries and Oceans Canada (DFO) offsetting plan to offset the unavoidable aquatic effects from the temporary instream berms for the 12 Street Southeast Bridge Replacement Project.
Strathcona Berm Stabilization Project
The Project is located near the City of Edmonton in Strathcona County. A front‑end engineering design study was completed by the client to determine the stability of the slopes adjacent to the site as well as identifying other reclamation concerns.
Recent Posts
Excess Soil Management for Transit Construction Projects
GREATER TORONTO AREA, ONTARIOPROJECT SUMMARY Canadian infrastructure and development projects require excess soil to be managed safely and in ways that promote beneficial reuse of valuable resources, reduce clean soil being sent to landfills, and mitigate...
Jack Tennant Memorial Bridge Fish Habitat Offsetting
CALGARY, ALBERTAPROJECT SUMMARY The Jack Tennant Memorial Bridge Fish Habitat Offsetting Project was required by Fisheries and Oceans Canada to offset the impact on fish and fish habitat resulting from the temporary instream bridge berm installed for the Jack Tennant...
12 Street Southeast Bridge Replacement Hydrotechnical Engineering and Environmental Services
CALGARY, ALBERTAPROJECT SUMMARY The original 12 Street Southeast Bridge was constructed in 1908 to carry horse and buggy, as well as pedestrians, to St. George’s Island. Over the next 100+ years, the bridge became an important connector link for vehicles and...
Fish Habitat Offsetting for 12 Street Southeast Bridge Replacement
CALGARY, ALBERTAPROJECT SUMMARY The City of Calgary required a Fisheries and Oceans Canada (DFO) offsetting plan to offset the unavoidable aquatic effects from the temporary instream berms for the 12 Street Southeast Bridge Replacement Project. Matrix Solutions Inc....
Strathcona Berm Stabilization Project
VULCAN COUNTY, ALBERTAPROJECT SUMMARY The Project is located near the City of Edmonton in Strathcona County. A front‑end engineering design study was completed by the client to determine the stability of the slopes adjacent to the site as well as identifying other...
We routinely lead characterization of stream morphology to:
- Assess fluvial erosion hazards
- Develop alternatives for erosion control in environmental assessments
- Develop management strategies as part of land use planning (subwatershed, secondary, tertiary plans and site plans)
- Assist in culvert/bridge design
- Define erosion thresholds to inform stormwater management