Featured – Environmental Sciences and Planning
12 Street Southeast Bridge Replacement Hydrotechnical Engineering and Environmental Services

12 Street Southeast Bridge Replacement Hydrotechnical Engineering and Environmental Services

The original 12 Street Southeast Bridge was constructed in 1908 to carry horse and buggy, as well as pedestrians, to St. George’s Island. Over the next 100+ years, the bridge became an important connector link for vehicles and pedestrians.

Fish Habitat Offsetting for 12 Street Southeast Bridge Replacement

Fish Habitat Offsetting for 12 Street Southeast Bridge Replacement

The City of Calgary required a Fisheries and Oceans Canada (DFO) offsetting plan to offset the unavoidable aquatic effects from the temporary instream berms for the 12 Street Southeast Bridge Replacement Project.

Strathcona Berm Stabilization Project

Strathcona Berm Stabilization Project

The Project is located near the City of Edmonton in Strathcona County. A front‑end engineering design study was completed by the client to determine the stability of the slopes adjacent to the site as well as identifying other reclamation concerns.

Recent Posts

Excess Soil Management for Transit Construction Projects

GREATER TORONTO AREA, ONTARIOPROJECT SUMMARY Canadian infrastructure and development projects require excess soil to be managed safely and in ways that promote beneficial reuse of valuable resources, reduce clean soil being sent to landfills, and mitigate...

Jack Tennant Memorial Bridge Fish Habitat Offsetting

CALGARY, ALBERTAPROJECT SUMMARY The Jack Tennant Memorial Bridge Fish Habitat Offsetting Project was required by Fisheries and Oceans Canada to offset the impact on fish and fish habitat resulting from the temporary instream bridge berm installed for the Jack Tennant...

Strathcona Berm Stabilization Project

VULCAN COUNTY, ALBERTAPROJECT SUMMARY The Project is located near the City of Edmonton in Strathcona County. A front‑end engineering design study was completed by the client to determine the stability of the slopes adjacent to the site as well as identifying other...

We routinely lead characterization of stream morphology to:

  • Assess fluvial erosion hazards
  • Develop alternatives for erosion control in environmental assessments
  • Develop management strategies as part of land use planning (subwatershed, secondary, tertiary plans and site plans)
  • Assist in culvert/bridge design
  • Define erosion thresholds to inform stormwater management

Learn about some of the interesting projects Matrix’s team of environmental consultants and engineers get to be a part of.

Got a specific question about a project or opportunity?

Use this form or the email address below to drop us a line and we’ll make sure it gets sent to the appropriate Matrix team.

General inquiries

Use the email below to contact our reception mailbox

Join the Matrix Team

We’re always looking for great people who share our values.

I hereby accept the terms and agreement