AltaLink Oldman River Bank Protection

AltaLink Oldman River Bank Protection

AltaLink Oldman River Bank Protection LETHBRIDGE, ALBERTA PROJECT SUMMARY The foundations of four AltaLink transmission structures were threatened due to significant bank erosion along a 900m reach of the Oldman River, Alberta. Further bank erosion could impact the...
Stormwater Management Functional Design

Stormwater Management Functional Design

Stormwater Management Functional Design LONDON, ONTARIO PROJECT OBJECTIVE As part of its Riverbend South Development, the City of London, Ontario needed to design stormwater facilities that would ensure the protection of sensitive fish habitat in a tributary to the...
Subwatershed Study to Support Land Use Planning

Subwatershed Study to Support Land Use Planning

Subwatershed Study to Support Land Use Planning SOUTHERN ONTARIO PROJECT SUMMARY In order to develop a new urban area, the Government of Ontario required our client, a local municipality, to complete a Conceptual Master Plan guided by the Government’s Official Plan....
Highway 407 East Expansion – Geomorphology and Channel Design

Highway 407 East Expansion – Geomorphology and Channel Design

Highway 407 East Expansion – Geomorphology and Channel Design GREATER TORONTO AREA, ONTARIO PROJECT SUMMARY The Province of Ontario is trying to facilitate the economic development of the Durham region and its municipalities through building highway and transit...
Calgary Zoo Flood Mitigation

Calgary Zoo Flood Mitigation

Calgary Zoo Flood Mitigation CALGARY, ALBERTA PROJECT SUMMARY The Calgary Zoo was severely impacted by the historical June 2013 floods in southern Alberta. Located primarily on St. George’s Island, a 32 acre body of land in the middle of the Bow River, the Zoo was...